RFP generator

Turn your requirements into a vendor-ready RFP

Paste a requirements list or a SOP. Every line is classified standard, config, or custom against a vendor-neutral corpus of SAP S/4HANA requirements, then assembled into a structured RFP you can download as a .docx.

SAP S/4HANA
Independent Architecture & Scope Guide

About the RFP generator

A requirements list is not an RFP. This turns one into the other: each requirement is classified standard, config, or custom against a corpus of proven implementations, architect-reviewed as it grows, then assembled into a structured document — scope, requirements, deliverables, evaluation criteria, timeline, and pricing format — that vendors can bid against line by line, and that you can download as a Word file.

Who it's for

Teams going to market for an enterprise platform implementation who have the requirements but not the time — or the template — to turn them into a document vendors can respond to properly.

What you get

Instant Output
  • A vendor-ready RFP in minutes rather than weeks of document assembly
  • Requirements written as capability statements, so responses are comparable across bidders
  • Your own standard-versus-custom read on every line, kept for interpreting the bids

How it works

3-step end-to-end workflow
  1. 1Step 1
    Paste your requirementsA list, a spreadsheet export, or a procedure — one requirement per line reads best, but freeform text works.
  2. 2Step 2
    Get the fit readEvery requirement is classified against the corpus, so you know the cost drivers before you publish the document.
  3. 3Step 3
    Assemble and downloadThe RFP is generated with the sections a vendor expects, and exported as a .docx you can edit and send.

Common questions

What sections does the generated RFP include?
Scope, the requirement set, expected deliverables, evaluation criteria, timeline, and a pricing format — the structure vendors expect, so responses come back comparable.
Can I use it as-is?
It is a working draft you own. Most teams add their commercial terms and organisational context before publishing; the requirements themselves are the part that usually takes longest, and that is what this produces.
How is this different from the SOP builder?
Same destination, different starting point. Use this when you already have requirements; use the SOP builder when what you have is process documentation.